Editor’s Note: With so much market volatility, stay on top of daily news! Get caught up in minutes with our speedy summary of today’s must-read news and expert opinions. Sign up here!
(Wallace Refiners) – Russia’s Nornickel, the world’s largest producer of palladium and high-grade nickel and a major producer of platinum and copper, announced Monday that the company has resumed production at the Oktyabrsky mine after successfully dealing with the flood. The mine’s workings have been drained; mining operations are restarting ahead of schedule.
The company said that the plan to restore normal operations has been updated. The Oktyabrsky mine (5.0 mtpa of ore) is expected to resume production in full by the end of April. Today, the mine’s capacity has already reached 60% of the target level. The expected date of production restart at the Taimyrsky mine (4.3 mtpa of ore) remains unchanged and is scheduled for early June.
Nornickel added that its strategy to backfill the entire perimeter of the workings extensively has paid off — water inflow has been stopped. The company is now focused on water discharge and accelerated production restart in compliance with all industrial safety and environmental standards.
Nornickel will announce an updated metal output guidance for FY 2021 once the plan to step up safety and reliability of the Norilsk Concentrator has been finalised.
Disclaimer: The views expressed in this article are those of the author and may not reflect those of Wallace Precious Metals The author has made every effort to ensure accuracy of information provided; however, neither Wallace Precious Metals nor the author can guarantee such accuracy. This article is strictly for informational purposes only. It is not a solicitation to make any exchange in commodities, securities or other financial instruments. Wallace Precious Metals and the author of this article do not accept culpability for losses and/ or damages arising from the use of this publication.